| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023389 | Name of Scheme: MALHUPURA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2177 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 18-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.06/101.33 | Malhupura | 28.98954944 | 78.28272635 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 255/46 | Malhupura | 28.98954944 | 78.28272635 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 125/14 | Malhupura | 28.98972122 | 78.28298377 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 150 | 0.084 | |
| 2 | K-7/DI | 100 | 0.0935 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.549 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.08076 | |
| 3 | PN-6 PE100/HDPE | 63 | 6.2461 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.1343 | |
| 5 | PN-6 PE100/HDPE | 125 | 1.1925 | |
| 6 | PN-6 PE100/HDPE | 140 | 0.6428 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.1414 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 358 |