Project Completion Certificate (Ground Water)
Scheme ID: 20023404 Name of Scheme: Bahadurpur Lokuwan WS No. of Villages: 1 No. of Habitation Covered: 274
Total Population Covered: 2820 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 24-Mar-2024 Actual Date of Completion (Capex): 24-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 24 Bahadurpur Lokuwan 25.408516 83.311579
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600/12 Bahadurpur Lokuwan 25.408516 83.311579
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 175/12 Bahadurpur Lokuwan 25.408516 83.311579
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.027
2 HDPE 75 2.504
3 HDPE 63 4.823
4 HDPE 110 0.249
5 HDPE 125 0.662
6 HDPE 140 0.203
7 HDPE 160 0.238
8 HDPE 180 0.048
HSC Connection
Sno. Total Nos.
1 274
Other Details
2.50
2.50
2.50
24-Mar-2024
25-Mar-2024