| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023421 | Name of Scheme: ATIRAJPUR GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2190 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 15-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM DIA SLOTTED PIPE | 15 | ATIRAJPUR | 27.12755 | 79.533954 |
| 2 | 150 MM DIA PLAIN PIPE | 78.14 | ATIRAJPUR | 27.12755 | 79.533954 |
| 3 | 200 MM DIA PLAIN PIPE | 60.16 | ATIRAJPUR | 27.12755 | 79.533954 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 452/62 | ATIRAJPUR | 27.12755 | 79.533954 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150/16 | ATIRAJPUR | 27.12755 | 79.533954 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | .040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.856 | |
| 2 | HDPE | 75 | .249 | |
| 3 | HDPE | 90 | .422 | |
| 4 | HDPE | 110 | .188 | |
| 5 | HDPE | 125 | .194 | |
| 6 | HDPE | 140 | .073 | |
| 7 | HDPE | 160 | .315 | |
| 8 | HDPE | 200 | .068 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 379 |