| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023498 | Name of Scheme: NANDAULI WATER SUPPLY | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 3580 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Mar-2023 | Actual Date of Completion (Capex): 31-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.00/101.84 | Nandauli | 26.438124 | 81.895131 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 750 LPM / 45 M | Nandauli | 26.438124 | 81.895131 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 16 M | Nandauli | 26.438124 | 81.895131 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 125 | 0.03486 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.996 | |
| 2 | HDPE | 75 | 0.545 | |
| 3 | HDPE | 63 | 16.229 | |
| 4 | HDPE | 180 | 1.071 | |
| 5 | HDPE | 140 | 1.368 | |
| 6 | HDPE | 110 | 0.860 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 598 |