Project Completion Certificate (Ground Water)
Scheme ID: 20023526 Name of Scheme: Busgawa WS No. of Villages: 1 No. of Habitation Covered: 343
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 28-Mar-2024 Actual Date of Completion (Capex): 28-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 30 Busgawa 25.41678 83.411467
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650/14 Busgawa 25.41678 83.411467
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 200/14 Busgawa 25.41678 83.411467
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.971
2 HDPE 75 5.398
3 HDPE 63 7.006
4 HDPE 110 1.213
5 HDPE 125 0.403
6 HDPE 140 0.117
7 HDPE 160 0.02
HSC Connection
Sno. Total Nos.
1 343
Other Details
3.02
3.02
3.02
28-Mar-2024
29-Mar-2024