Project Completion Certificate (Ground Water)
Scheme ID: 20023554 Name of Scheme: Shantipur Torwan WS No. of Villages: 3 No. of Habitation Covered: 654
Total Population Covered: 5200 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 01-Apr-2024 Actual Date of Completion (Capex): 01-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 21 Shantipur Torwan 25.441031 83.413341
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1050/16 Shantipur Torwan 25.441031 83.413341
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Reservoir 300/16 Shantipur Torwan 25.441031 83.413341
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 di 150 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.85
2 HDPE 75 4.466
3 HDPE 63 12.953
4 HDPE 110 0.428
5 HDPE 125 0.37
6 HDPE` 140 1.57
7 HDPE 160 1.205
8 HDPE 180 0.731
9 HDPE 200 0.032
HSC Connection
Sno. Total Nos.
Other Details
4.38
4.38
4.38
01-Apr-2024
02-Apr-2024