| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023554 | Name of Scheme: Shantipur Torwan WS | No. of Villages: 3 | No. of Habitation Covered: 654 |
| Total Population Covered: 5200 | Base Year: 2022 | Intermediate Year: 2027 | Design Year: 2032 |
| Date of Completion (As per Contract): 01-Apr-2024 | Actual Date of Completion (Capex): 01-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Strainer | 21 | Shantipur Torwan | 25.441031 | 83.413341 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1050/16 | Shantipur Torwan | 25.441031 | 83.413341 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Reservoir | 300/16 | Shantipur Torwan | 25.441031 | 83.413341 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | di | 150 | 0.045 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.85 | |
| 2 | HDPE | 75 | 4.466 | |
| 3 | HDPE | 63 | 12.953 | |
| 4 | HDPE | 110 | 0.428 | |
| 5 | HDPE | 125 | 0.37 | |
| 6 | HDPE` | 140 | 1.57 | |
| 7 | HDPE | 160 | 1.205 | |
| 8 | HDPE | 180 | 0.731 | |
| 9 | HDPE | 200 | 0.032 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |