Project Completion Certificate (Ground Water)
Scheme ID: 20023634 Name of Scheme: KOHRAOV GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3513 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 13-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe - 300 mm dia 60.70 Kohraov 25.940901 82.193565
2 Slotted Pipe - 300 mm dia 18.04 Kohraov 25.940901 82.193565
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 30/49 Kohraov 25.940901 82.193565
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast-In-Situ 150/12 Kohraov 25.940901 82.193565
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.380
2 HDPE 75 1.141
3 HDPE 90 0.940
4 HDPE 110 0.777
5 HDPE 125 0.378
6 HDPE 140 0.308
7 HDPE 160 0.149
HSC Connection
Sno. Total Nos.
1 244
Other Details
1.86
1.81
1.65
30-Nov-2024
01-Dec-2024