| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023634 | Name of Scheme: KOHRAOV GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3513 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 13-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe - 300 mm dia | 60.70 | Kohraov | 25.940901 | 82.193565 |
| 2 | Slotted Pipe - 300 mm dia | 18.04 | Kohraov | 25.940901 | 82.193565 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 30/49 | Kohraov | 25.940901 | 82.193565 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast-In-Situ | 150/12 | Kohraov | 25.940901 | 82.193565 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.380 | |
| 2 | HDPE | 75 | 1.141 | |
| 3 | HDPE | 90 | 0.940 | |
| 4 | HDPE | 110 | 0.777 | |
| 5 | HDPE | 125 | 0.378 | |
| 6 | HDPE | 140 | 0.308 | |
| 7 | HDPE | 160 | 0.149 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 244 |