| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023704 | Name of Scheme: Kewatli Kalan | No. of Villages: 8 | No. of Habitation Covered: 20 |
| Total Population Covered: 5840 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Mar-2024 | Actual Date of Completion (Capex): 28-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 20/76.98 | Kewatli Kalan | 25.965331 | 82.382627 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-25HP | 1250/48 | Kewatli Kalan | 25.965331 | 82.382627 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL/14M | Kewatli Kalan | 25.965337 | 82.382613 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.234 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.646 | |
| 3 | HDPE PIPE PN-6 | 140 | 2.509 | |
| 4 | HDPE PIPE PN-6 | 110 | 3.068 | |
| 5 | HDPE PIPE PN-6 | 90 | 3.218 | |
| 6 | HDPE PIPE PN-6 | 75 | 1.682 | |
| 7 | HDPE PIPE PN-6 | 63 | 23.5975 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 873 |