Project Completion Certificate (Ground Water)
Scheme ID: 20023719 Name of Scheme: YUSUPH PUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2387 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Feb-2024 Actual Date of Completion (Capex): 22-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Plain Pipe (m) 113.87 TW 25.489763 83.998215
2 Depth of Strainer (m) 30 TW 25.489763 83.998215
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 500/45 TW 25.489763 83.998215
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc tank 150/12 OHT 25.489763 83.998215
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.27
2 HDPE 75 0.61
3 HDPE 90 0.2
4 HDPE 110 0.2
5 HDPE 125 0.27
6 HDPE 140 0.41
7 HDPE 160 0.12
8 HDPE 200 0.24
HSC Connection
Sno. Total Nos.
1 381
Other Details
2.32
2.39
1.79
22-Apr-2025
23-Apr-2025