Project Completion Certificate (Ground Water)
Scheme ID: 20023896 Name of Scheme: SHAHZADPUR No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3030 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/103.28 SHAHZADPUR 27.934853 80.035412
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 39.60 M3/45M SHAHZADPUR 27.934853 80.035412
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL - 16 M SHAHZADPUR 27.931245 80.038547
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.753
2 HDPE / 6KG 75 1.378
3 HDPE / 6KG 90 0.745
4 HDPE / 6KG 110 1.725
5 HDPE / 6KG 160 2.433
6 HDPE / 6KG 180 .063
HSC Connection
Sno. Total Nos.
1 730
Other Details
2.57
0.00
2.57
04-Apr-2024
06-Dec-2024