| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023908 | Name of Scheme: Mahmadpur Saijania | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3100 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 30-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.06/89.22 | MAHMADPUR SAIJANIA | 28.096504 | 80.21745 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 42.12M3/45M | MAHMADPUR SAIJANIA | 28.096504 | 80.21745 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 200KL-14M | MAHMADPUR SAIJANIA | 28.096585 | 80.21754 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 13.529 | |
| 2 | HDPE/6KG | 75 | 3.357 | |
| 3 | HDPE/6KG | 90 | 1.889 | |
| 4 | HDPE/6KG | 110 | 0.450 | |
| 5 | HDPE/6KG | 140 | 0.152 | |
| 6 | HDPE/6KG | 180 | 0.055 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 625 |