| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024005 | Name of Scheme: Gobindpur water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 350 |
| Total Population Covered: 2030 | Base Year: 2022 | Intermediate Year: 2027 | Design Year: 2032 |
| Date of Completion (As per Contract): 28-Mar-2024 | Actual Date of Completion (Capex): 28-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Strainer | 24 | Gobindpur | 25.275104 | 82.45574 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450/14 | Gobindpur | 25.275104 | 82.45574 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Reservoir | 125/14 | Gobindpur | 25.275104 | 82.45574 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.045 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.805 | |
| 2 | HDPE | 75 | 0.98 | |
| 3 | HDPE | 63 | 6.113 | |
| 4 | HDPE | 110 | 0.022 | |
| 5 | HDPE | 140 | 0.32 | |
| 6 | HDPE | 160 | 0.019 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 350 |