| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024243 | Name of Scheme: ALIAPUR JJM SCHEME | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 3503 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Mar-2024 | Actual Date of Completion (Capex): 06-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 27/119.8 | Aliapur | 28.15144 | 80.62455 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 750/43 | Aliapur | 28.151507 | 80.62455 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/16 | Aliapur | 28.15121 | 80.624398 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.879 | |
| 2 | HDPE | 75 | 0.246 | |
| 3 | HDPE | 63 | 7.640 | |
| 4 | HDPE | 110 | 1.160 | |
| 5 | HDPE | 160 | 0.853 | |
| 6 | HDPE | 140 | 1.270 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 533 |