Scheme ID: 20024485 Name of Scheme: Badri Pooth PWS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3330 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 15-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24 /160.32 Badripooth 26.860885 79.088157
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 45(M³/Hr.)48Mtr. Badripooth 26.860885 79.088157
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/18 Badripooth 26.860885 79.088157
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.872
2 HDPE 75 1.433
3 HDPE 90 1.042
4 HDPE 110 2.546
5 HDPE 140 0.434
6 HDPE 160 0.108
7 HDPE 180 0.082
HSC Connection
Sno. Total Nos.
1 609
Other Details
225.56
274.98
274.98
21-Jun-2024
22-Jun-2024