| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024486 | Name of Scheme: MUDIYA KHERA JJM SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2820 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2023 | Actual Date of Completion (Capex): 11-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24/125.5 | MUDIYA KHERA | 27.9112978 | 80.7628368 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 600/38 | MUDIYA KHERA | 27.90943 | 80.770775 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | MUDIYA KHERA | 27.94283 | 80.770826 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0254 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.350 | |
| 2 | HDPR | 75 | 1.058 | |
| 3 | HDPE | 63 | 7.750 | |
| 4 | HDPE | 110 | 0.300 | |
| 5 | HDPE | 140 | 1.216 | |
| 6 | HDPE | 160 | 0.452 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 547 |