Scheme ID: 20024493 Name of Scheme: NIZAMPUR PWS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2185 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 16-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.00/142.84 Nizampur 26.881176 78.8420120
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 30(M³/Hr.)/53Mtr. Nizampur 26.881176 78.8420120
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Nizampur 26.881176 78.8420120
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.772
2 HDPE 75 0.769
3 HDPE 90 0.234
4 HDPE 110 0.118
5 HDPE 140 0.858
6 HDPE 160 0.764
7 HDPE 180 0.020
HSC Connection
Sno. Total Nos.
1 383
Other Details
168.58
197.42
197.42
22-Jun-2024