Project Completion Certificate (Ground Water)
Scheme ID: 20024500 Name of Scheme: Dasaupur water Supply No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Aug-2025 Actual Date of Completion (Capex): 09-Aug-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.00/201.84 Dasoopur 26.235517 82.596652
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 700 LMP Dasoopur 26.235517 82.596652
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/12M Dasoopur 26.235517 82.596652
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K9 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 .610
2 HDPE 75 .83
3 HDPE 63 7.47
4 HDPE 200 0.03
5 HDPE 180 0.390
6 HDPE 160 0.020
7 HDPE 140 0.460
8 HDPE 125 0.33
9 HDPE 110 0.66
HSC Connection
Sno. Total Nos.
1 595
Other Details
242.00
0.00
2.45
18-May-2025
05-Jan-2026