Project Completion Certificate (Ground Water)
Scheme ID: 20024510 Name of Scheme: BHULPUR PWS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1650 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.09/106.24 Bhulpur 26.717885 79.086861
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 24(M³/Hr.)/45Mtr. Bhulpur 26.717885 79.086861
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Bhulpur 26.717885 79.086861
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.723
2 HDPE 75 0.692
3 HDPE 90 0.334
4 HDPE 110 1.077
5 HDPE 140 0.605
HSC Connection
Sno. Total Nos.
1 330
Other Details
1.28
1.59
1.59
14-Jun-2024
15-Jun-2024