Project Completion Certificate (Ground Water)
Scheme ID: 20024515 Name of Scheme: SABDALPUR DAUDPUR No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2350 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 22-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.00/151.05 sabdalpur Daudpur 26.808682 79.251722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 30(M³/Hr.)/49Mtr. sabdalpur Daudpur 26.808682 79.251722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 sabdalpur Daudpur 26.808682 79.251722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.649
2 HDPE 75 1.378
3 HDPE 90 1.402
4 HDPE 110 1.513
5 HDPE 140 1.203
6 HDPE 160 0.696
7 HDPE 180 0.382
HSC Connection
Sno. Total Nos.
1 470
Other Details
171.72
205.72
205.72
27-Jun-2024
28-Jun-2024