| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20024538 | Name of Scheme: Ayara Luhia PWS | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3185 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 06-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 30.03 Mtr / 135.79 Mtr | Ayara Luhiya | 26.850513* | 79.123994* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 42 M^3 /46 Mtr | Ayara Luhiya | 26.850513* | 79.123994* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /16 Mtr | Ayara Luhiya | 26.850513* | 79.123994* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 0.034 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.253 | |
| 2 | HDPE | 75 | .470 | |
| 3 | HDPE | 90 | 1.711 | |
| 4 | HDPE | 110 | .934 | |
| 5 | HDPE | 140 | 3.679 | |
| 6 | HDPE | 160 | .308 | |
| 7 | HDPE | 180 | 0.015 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 630 |