Project Completion Certificate (Ground Water)
Scheme ID: 20024538 Name of Scheme: Ayara Luhia PWS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3185 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 06-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30.03 Mtr / 135.79 Mtr Ayara Luhiya 26.850513* 79.123994*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 42 M^3 /46 Mtr Ayara Luhiya 26.850513* 79.123994*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /16 Mtr Ayara Luhiya 26.850513* 79.123994*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.034
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.253
2 HDPE 75 .470
3 HDPE 90 1.711
4 HDPE 110 .934
5 HDPE 140 3.679
6 HDPE 160 .308
7 HDPE 180 0.015
HSC Connection
Sno. Total Nos.
1 630
Other Details
2.01
2.57
2.57
06-Jun-2024
07-Jun-2024