Project Completion Certificate (Ground Water)
Scheme ID: 20024681 Name of Scheme: BHADAULI PWS SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2522 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Mar-2022 Actual Date of Completion (Capex): 31-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 19.09/69.26 BHADAULI 28.773135 77.430425
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 350/51 BHADAULI 28.773135 77.430425
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 BHADAULI 28.773135 77.430425
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 .015 WORK HAS BEEN COMPLETED
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.121 WORK HAS BEEN COMPLETED
2 HDPE 75 .188 WORK HAS BEEN COMPLETED
3 HDPE 90 .321 WORK HAS BEEN COMPLETED
4 HDPE 110 .055 WORK HAS BEEN COMPLETED
5 HDPE 140 .643 WORK HAS BEEN COMPLETED
HSC Connection
Sno. Total Nos.
1 374
Other Details
1.51
1.54
1.54
28-Feb-2025
01-Mar-2025