Project Completion Certificate (Ground Water)
Scheme ID: 20024855 Name of Scheme: Peher Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 06-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 77.05 Peher 27.25687 82.33081
2 Strainer 29.15 Peher 27.25687 82.33081
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible VT Pump 870/41 Peher 27.25687 82.33081
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 Peher 27.25687 82.33081
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 200 mm dia HDPE Pipe PN 6: Class PE 100 200 0.090
2 160 mm dia HDPE Pipe PN 6: Class PE 100 160 0.021
3 140 mm dia HDPE Pipe PN 6: Class PE 100 140 0.327
4 110 mm dia HDPE Pipe PN 6: Class PE 100 110 0.571
5 90 mm dia HDPE Pipe PN 6: Class PE 100 90 1.978
6 75 mm dia HDPE Pipe PN 6: Class PE 100 75 0.472
7 63 mm dia HDPE Pipe PN 6: Class PE 100 63 4.220
HSC Connection
Sno. Total Nos.
1 605
Other Details
2.15
0.00
2.49
06-Dec-2025
07-Dec-2025