| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025166 | Name of Scheme: Mustafabad Khas Rural Bad Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 5115 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Mar-2023 | Actual Date of Completion (Capex): 15-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.08/139.68 | MUSTFABAD | 26.10519 | 83.28394 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700/47 | MUSTFABAD | 26.10519 | 83.28394 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/14 | MUSTFABAD | 26.10519 | 83.28394 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI PIPE | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 15.144 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.220 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.423 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.160 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 416 |