Project Completion Certificate (Ground Water)
Scheme ID: 20025166 Name of Scheme: Mustafabad Khas Rural Bad Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 5115 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Mar-2023 Actual Date of Completion (Capex): 15-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.08/139.68 MUSTFABAD 26.10519 83.28394
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 700/47 MUSTFABAD 26.10519 83.28394
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/14 MUSTFABAD 26.10519 83.28394
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 15.144
2 HDPE Pipe PN-6: Class PE-100 75 0.220
3 HDPE Pipe PN-6: Class PE-100 90 0.423
4 HDPE Pipe PN-6: Class PE-100 140 0.160
HSC Connection
Sno. Total Nos.
1 416
Other Details
3.49
3.49
3.37
16-Jun-2024
17-Jun-2024