Project Completion Certificate (Ground Water)
Scheme ID: 20025202 Name of Scheme: PITARAPUR No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3415 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 01-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.04/125.91 PITARAPUR 26.45144568 80.11953069
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750/60 PITARAPUR 26.45144568 80.11953069
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 PITARAPUR 26.45144568 80.11953069
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01665
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.942
2 HDPE 90 2.975
3 HDPE 110 0.972
4 HDPE 125 1.354
5 HDPE 140 0.246
HSC Connection
Sno. Total Nos.
1 640
Other Details
3.55
0.00
2.92
12-Jan-2024
13-Jan-2024