Project Completion Certificate (Ground Water)
Scheme ID: 20025211 Name of Scheme: BARRA THARRA No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3941 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 01-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.23/256.74 BARRA THARRA 26.71010 79.89086
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800/64 BARRA THARRA 26.71010 79.89086
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/18 BARRA THARRA 26.71010 79.89086
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0135
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.140
2 HDPE 90 2.838
3 HDPE 110 1.176
4 HDPE 125 0.744
5 HDPE 140 0.959
6 HDPE 160 0.665
7 HDPE 180 0.596
HSC Connection
Sno. Total Nos.
1 745
Other Details
3.85
0.00
3.34
17-Mar-2024
18-Mar-2024