Project Completion Certificate (Ground Water)
Scheme ID: 20025219 Name of Scheme: Bairisal No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4740 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 10-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28.32/205.08 BAIRISAL 26.735174 79.803595
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1050/64 BAIRISAL 26.735174 79.803595
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/18 BAIRISAL 26.735174 79.803595
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.139
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.944
2 HDPE 90 2.014
3 HDPE 110 0.886
4 HDPE 125 0.668
5 HDPE 140 1.782
6 HDPE 160 1.112
7 HDPE 180 0.526
HSC Connection
Sno. Total Nos.
1 813
Other Details
4.34
0.00
3.57
17-Feb-2024
18-Feb-2024