Project Completion Certificate (Ground Water)
Scheme ID: 20025222 Name of Scheme: Korhwa No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3833 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 02-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.17/206.84 KORHWA 26.512248 80.014053
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 950/72 KORHWA 26.512248 80.014053
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/16 KORHWA 26.512248 80.014053
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.00835
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.333
2 HDPE 110 1.913
3 HDPE 90 4.143
4 HDPE 125 0.196
5 HDPE 140 0.583
6 HDPE 180 0.526
HSC Connection
Sno. Total Nos.
1 875
Other Details
4.33
0.00
3.59
18-Jun-2023
19-Jun-2023