Project Completion Certificate (Ground Water)
Scheme ID: 20025235 Name of Scheme: AMAULI THAKURAN No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3807 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 20-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 14/62.55 AMAULI THAKURAN 26.312933 79.495249
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 950/65 AMAULI THAKURAN 26.312933 79.495249
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/18 AMAULI THAKURAN 26.312933 79.495249
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0101
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.073
2 HDPE 90 2.068
3 HDPE 110 0.922
4 HDPE 125 0.621
5 HDPE 140 1.243
6 HDPE 160 1.825
HSC Connection
Sno. Total Nos.
1 793
Other Details
4.19
0.00
3.44
05-Apr-2024
06-Apr-2024