Project Completion Certificate (Ground Water)
Scheme ID: 20025294 Name of Scheme: Sunasi No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 4981 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Sep-2023 Actual Date of Completion (Capex): 02-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26/272.38 SUNASI 26.68737 79.91566
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1000/64 SUNASI 26.68737 79.91566
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/18 SUNASI 26.68737 79.91566
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0125
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.710
2 HDPE 90 2.735
3 HDPE 110 1.174
4 HDPE 125 0.534
5 HDPE 140 2.139
6 HDPE 160 0.380
HSC Connection
Sno. Total Nos.
1 948
Other Details
4.78
0.00
3.92
17-Mar-2024
18-Mar-2024