Project Completion Certificate (Ground Water)
Scheme ID: 20025394 Name of Scheme: Akbarpur sadat No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5052 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 46.31 Mtr / 94.46 Mtr AKBARPUR SADAT 29.191679 77.931592
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LPM / 50 Mtr AKBARPUR SADAT 29.191679 77.931592
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 12 M AKBARPUR SADAT 29.191679 77.931592
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.02095
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.355
2 HDPE 90 0.111
3 HDPE 110 1.006
4 HDPE 125 0.80
5 HDPE 140 0.619
6 HDPE 160 0.110
HSC Connection
Sno. Total Nos.
1 797
Other Details
3.90
3.90
3.13
13-Jun-2023
10-Dec-2024