Project Completion Certificate (Ground Water)
Scheme ID: 20025455 Name of Scheme: DIVARI PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3049 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 09-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.09 M / 36.02 M Divari 26.639233 79.693483
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible Pump 650 LPM / 51 M Divari 26.639233 79.693483
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 14 M Divari 26.639233 79.693483
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I . 100 0.0343
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.789
2 HDPE 90 0.910
3 HDPE 110 0.363
4 HDPE 125 0.661
5 HDPE 140 1.120
6 HDPE 160 0.271
HSC Connection
Sno. Total Nos.
1 599
Other Details
2.41
0.00
2.42
24-Jun-2023
09-Mar-2023