Project Completion Certificate (Ground Water)
Scheme ID: 20025458 Name of Scheme: JiwaSirsani PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3322 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Dec-2021 Actual Date of Completion (Capex): 09-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.464
2 HDPE 90 6.459
3 HDPE 110 1.447
4 HDPE 125 .62
HSC Connection
Sno. Total Nos.
Other Details
2.64
0.00
2.65
30-Nov-2023
01-Dec-2024