Project Completion Certificate (Ground Water)
Scheme ID: 20025553 Name of Scheme: Bilti No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2250 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 24-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5900
2 HDPE 75 336
3 HDPE 90 93
4 HDPE 110 470
5 HDPE 140 527
HSC Connection
Sno. Total Nos.
Other Details
1.79
1.79
1.79
30-Apr-2023
01-May-2023