| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025595 | Name of Scheme: PURWA PITARAM PWS | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4560 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2022 | Actual Date of Completion (Capex): 02-Apr-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.12 M / 101.55 M | Purwa Pitaram | 26.767381 | 79.459743 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (60.23 M3/Hr.) / 46 M | Purwa Pitaram | 26.767381 | 79.459743 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300 KL / 16 M | Purwa Pitaram | 26.763842 | 79.459644 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.745 | |
| 2 | HDPE | 75 | 0.656 | |
| 3 | HDPE | 90 | 1.048 | |
| 4 | HDPE | 110 | 1.017 | |
| 5 | HDPE | 160 | 0.705 | |
| 6 | HDPE | 200 | 0.226 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1103 |