Project Completion Certificate (Ground Water)
Scheme ID: 20025595 Name of Scheme: PURWA PITARAM PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4560 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 02-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12 M / 101.55 M Purwa Pitaram 26.767381 79.459743
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (60.23 M3/Hr.) / 46 M Purwa Pitaram 26.767381 79.459743
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 16 M Purwa Pitaram 26.763842 79.459644
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.745
2 HDPE 75 0.656
3 HDPE 90 1.048
4 HDPE 110 1.017
5 HDPE 160 0.705
6 HDPE 200 0.226
HSC Connection
Sno. Total Nos.
1 1103
Other Details
2.24
2.78
2.78
09-Jul-2023
10-Jul-2023