Scheme ID: 20025893 Name of Scheme: Rasulpur Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 12
Total Population Covered: 1881 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Nov-2023 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 150mm dia 76.44 TW 26.028496 83.425984
2 Slotted pipe 150 mm dia 14.49 TW 26.028496 83.425984
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 500LPM/250m TW 26.028496 83.425984
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 100/12 OHT 26.02851 83.425903
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 4.994
2 HDPE PN6 PE100 75 1.291
3 HDPE PN6 PE100 90 0.29
4 HDPE PN6 PE100 110 0.29
5 HDPE PN6 PE100 140 0.64
6 HDPE PN6 PE100 160 0.11
HSC Connection
Sno. Total Nos.
1 273
Other Details
2.14
2.00
0.00
12-Jun-2024
25-Mar-2025