Project Completion Certificate (Ground Water)
Scheme ID: 20025902 Name of Scheme: SARAILA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2310 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Mar-2024 Actual Date of Completion (Capex): 20-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200x200 mm 112.52 Saraila 26.02974 80.914002
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 500/55 SARAILA 26.02974 80.914002
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 150/12 SARAILA 26.030118 80.914182
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 140 94.5
2 HDPE PIPE 125 371.20
3 HDPE PIPE 110 284.50
4 HDPE PIPE 90 389.50
5 HDPE PIPE 75 1943.80
6 HDPE PIPE 63 2325.40
HSC Connection
Sno. Total Nos.
1 681
Other Details
1.87
1.90
1.90
20-Sep-2023
21-Sep-2023