| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025902 | Name of Scheme: SARAILA | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2310 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Mar-2024 | Actual Date of Completion (Capex): 20-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200x200 mm | 112.52 | Saraila | 26.02974 | 80.914002 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 500/55 | SARAILA | 26.02974 | 80.914002 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 150/12 | SARAILA | 26.030118 | 80.914182 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 140 | 94.5 | |
| 2 | HDPE PIPE | 125 | 371.20 | |
| 3 | HDPE PIPE | 110 | 284.50 | |
| 4 | HDPE PIPE | 90 | 389.50 | |
| 5 | HDPE PIPE | 75 | 1943.80 | |
| 6 | HDPE PIPE | 63 | 2325.40 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 681 |