Project Completion Certificate (Ground Water)
Scheme ID: 20025926 Name of Scheme: Deoraon PWS No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 5485 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 25-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.3 M / 156.65 M Deoraon 26.719243 79.496206
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (70.7 M3/Hr.) / 42 M Deoraon 26.719243 79.496206
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 KL / 14 M Deoraon 26.719225 79.496414
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.014
2 D.I. 200 0.001
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.89
2 HDPE 75 1.251
3 HDPE 90 1.11
4 HDPE 110 1.898
5 HDPE 140 1.869
6 HDPE 200 0.034
HSC Connection
Sno. Total Nos.
1 1122
Other Details
3.92
3.35
3.35
14-Sep-2023
15-Sep-2023