| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025926 | Name of Scheme: Deoraon PWS | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 5485 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2022 | Actual Date of Completion (Capex): 25-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.3 M / 156.65 M | Deoraon | 26.719243 | 79.496206 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (70.7 M3/Hr.) / 42 M | Deoraon | 26.719243 | 79.496206 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 KL / 14 M | Deoraon | 26.719225 | 79.496414 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.014 | |
| 2 | D.I. | 200 | 0.001 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.89 | |
| 2 | HDPE | 75 | 1.251 | |
| 3 | HDPE | 90 | 1.11 | |
| 4 | HDPE | 110 | 1.898 | |
| 5 | HDPE | 140 | 1.869 | |
| 6 | HDPE | 200 | 0.034 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1122 |