| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025986 | Name of Scheme: AWASTHI GP WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-Feb-2024 | Actual Date of Completion (Capex): 24-Mar-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 18.08/93.89 | AWASTHI | 26.435845 | 83.587674 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 500/45 | AWASTHI | 26.435845 | 83.587674 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/14 | AWASTHI | 26.435845 | 83.587674 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 5.6117 | |
| 2 | HDPE PIPE | 75 | 0.29876 | |
| 3 | HDPE PIPE | 90 | 0.31518 | |
| 4 | HDPE PIPE | 110 | 0.43569 | |
| 5 | HDPE PIPE | 140 | 0.20876 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |