Project Completion Certificate (Ground Water)
Scheme ID: 20026061 Name of Scheme: SETHA KALA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4530 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 12-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lower of Tubewell 30.03/75.8 Setha Kala 26º 18' 59.072" N 82º 40' 19.877" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC Submersible Pump 57/42 Setha Kala 26º 18' 59.064" N 82º 40' 19.871" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink alum Tank 275/12 Setha Kala 26º 18' 59.064" N 82º 40' 19.871" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 13.399
2 HDPE Pipe PN-6: Class PE-100 75 7.962
3 HDPE Pipe PN-6: Class PE-100 90 1.554
4 HDPE Pipe PN-6: Class PE-100 110 0.677
5 HDPE Pipe PN-6: Class PE-100 140 1.531
6 HDPE Pipe PN-6: Class PE-100 160 0.511
7 HDPE Pipe PN-6: Class PE-100 200 0.241
HSC Connection
Sno. Total Nos.
1 535
Other Details
3.54
0.00
3.34
30-Jun-2024
01-Jul-2024