Scheme ID: 20026066 Name of Scheme: AFJALPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3970 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 16-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 LOWERING WORK 24.1/ 99.83 AFJALPUR 26.429878 82.579537
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC Submmercible 850/44 AFJALPUR 26.429878 82.579537
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC WORK 255/14 AFJALPUR 26.429878 82.579537
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K7 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.120
2 HDPE Pipe PN-6: Class PE-100 75 0.39
3 HDPE Pipe PN-6: Class PE-100 63 12.678
4 HDPE Pipe PN-6: Class PE-100 110 0.755
5 HDPE Pipe PN-6: Class PE-100 140 1.381
6 HDPE Pipe PN-6: Class PE-100 160 0.052
HSC Connection
Sno. Total Nos.
1 570
Other Details
2.91
3.23
3.23
16-Feb-2026
18-Feb-2026