Project Completion Certificate (Ground Water)
Scheme ID: 20026085 Name of Scheme: ITWAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3440 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Aug-2023 Actual Date of Completion (Capex): 20-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.08/51.79 ITVA 26º 26' 18.043" N 82º 20' 4.05" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 30/47 ITVA 82º 20' 4.05" E 82º 20' 4.05" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC- Zink Alum Tank 150/16 Itva 82º 20' 4.05" E 82º 20' 4.05" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe-K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN6-PE-100 62 8.319
2 HDPE-PN6-PE-100 75 0.793
3 HDPE-PN6-PE-100 90 0.849
4 HDPE-PN6-PE-100 110 0.550
5 HDPE-PN6-PE-100 125 0.058
6 HDPE-PN6-PE-100 140 0.047
HSC Connection
Sno. Total Nos.
Other Details
1.79
0.00
1.84
02-Dec-2024
03-Dec-2024