Project Completion Certificate (Ground Water)
Scheme ID: 20026092 Name of Scheme: Kelamau PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1405 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 08-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.00/142.84 Kelamau 26.832417 79.096327
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 21(M³/Hr.)/42Mtr. Kelamau 26.832417 79.096327
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Kelamau 26.832417 79.096327
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.725
2 HDPE 75 0.724
3 HDPE 90 0.224
4 HDPE 110 0.485
5 140 140 0.075
HSC Connection
Sno. Total Nos.
1 290
Other Details
120.65
146.28
146.28
16-Apr-2024
17-Apr-2024