| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026092 | Name of Scheme: Kelamau PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1405 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 08-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 18.00/142.84 | Kelamau | 26.832417 | 79.096327 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 21(M³/Hr.)/42Mtr. | Kelamau | 26.832417 | 79.096327 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | Kelamau | 26.832417 | 79.096327 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.725 | |
| 2 | HDPE | 75 | 0.724 | |
| 3 | HDPE | 90 | 0.224 | |
| 4 | HDPE | 110 | 0.485 | |
| 5 | 140 | 140 | 0.075 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 290 |