Project Completion Certificate (Ground Water)
Scheme ID: 20026096 Name of Scheme: Rasulabad PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1450 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 27-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 09/112.28 Rasulabad 29.821715 79.151477
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 20(M³/Hr.)/42Mtr. Rasulabad 29.821715 79.151477
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Rasulabad 29.821715 79.151477
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.609
2 HDPE 75 0.749
3 HDPE 90 0.829
4 HDPE 110 0.692
5 HDPE 140 0.350
6 HDPE 160 0.066
HSC Connection
Sno. Total Nos.
1 275
Other Details
1.26
1.51
1.51
08-Jun-2024
09-Jun-2024