| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026097 | Name of Scheme: SAHJANA HAMJAPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 4320 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 28-Sep-2023 | Actual Date of Completion (Capex): 14-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well-1 | 18/75.30 | Sahjan Hamjapur | 26º 27' 6.034" N | N 82º 51' 48.565" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 36/46 | Sahjan Hamjapur | 26º 27' 6.034" N | N 82º 51' 48.565" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI -K-7 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6, PE-100 | 63 | 9.490 | |
| 2 | HDPE PN-6, PE-100 | 75 | 2.543 | |
| 3 | HDPE PN-6, PE-100 | 90 | 1.078 | |
| 4 | HDPE PN-6, PE-100 | 110 | 0.723 | |
| 5 | HDPE PN-6, PE-100 | 125 | 0.240 | |
| 6 | HDPE PN-6, PE-100 | 140 | 0.256 | |
| 7 | HDPE PN-6, PE-100 | 160 | 0.999 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 337 |