Project Completion Certificate (Ground Water)
Scheme ID: 20026097 Name of Scheme: SAHJANA HAMJAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4320 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 14-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well-1 18/75.30 Sahjan Hamjapur 26º 27' 6.034" N N 82º 51' 48.565" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 36/46 Sahjan Hamjapur 26º 27' 6.034" N N 82º 51' 48.565" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 63 9.490
2 HDPE PN-6, PE-100 75 2.543
3 HDPE PN-6, PE-100 90 1.078
4 HDPE PN-6, PE-100 110 0.723
5 HDPE PN-6, PE-100 125 0.240
6 HDPE PN-6, PE-100 140 0.256
7 HDPE PN-6, PE-100 160 0.999
HSC Connection
Sno. Total Nos.
1 337
Other Details
215.92
0.00
213.80
05-Dec-2024
06-Dec-2024