Project Completion Certificate (Ground Water)
Scheme ID: 20026098 Name of Scheme: Muraitha PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2200 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 25-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.06
2 HDPE 75 1.39
3 HDPE 90 0.631
4 HDPE 110 0.54
5 HDPE 140 1.13
6 HDPE 160 0.48
7 HDPE 180 0.316
HSC Connection
Sno. Total Nos.
Other Details
1.59
1.79
1.79
20-May-2023
21-May-2023