Project Completion Certificate (Ground Water)
Scheme ID: 20026106 Name of Scheme: AKTHARA NARAYANPUR WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2630 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 28-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubwell Assembly 24.07M/81.03M Akhtara Narayanpur 26.397344 82.951007
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.HP Submersible Pump 550LPM/46m Akhtara Narayanpur 26.397344 82.951007
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175 KL/ 14 M Akhtara Narayanpur 26.397344 82.951007
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.747
2 HDPE Pipe PN-6: Class PE-100 75 1.269
3 HDPE Pipe PN-6: Class PE-100 63 8.966
4 HDPE Pipe PN-6: Class PE-100 110 0.503
5 HDPE Pipe PN-6: Class PE-100 125 1.108
6 HDPE Pipe PN-6: Class PE-100 140 0.780
7 HDPE Pipe PN-6: Class PE-100 160 0.131
HSC Connection
Sno. Total Nos.
1 451
Other Details
2.20
2.20
2.20
08-Feb-2025
09-Feb-2025