Project Completion Certificate (Ground Water)
Scheme ID: 20026109 Name of Scheme: AREEFPUR SARI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3150 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 14-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 82.81/21.01 Areefpur sari 26º 28' 4.45" N 82º 52' 36.88" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 22.8/42 Areefpur Sari 26º 28' 4.45" N 82º 52' 36.88" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum OHT-1 125/12 Areefpur Sari 26º 28' 4.45" N 82º 52' 36.88" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.557
2 HDPE Pipe PN-6: Class PE-100 75 1.355
3 HDPE Pipe PN-6: Class PE-100 90 0.199
4 HDPE Pipe PN-6: Class PE-100 110 0.305
5 HDPE Pipe PN-6: Class PE-100 125 0.695
HSC Connection
Sno. Total Nos.
1 400
Other Details
3.12
0.00
3.28
05-Dec-2024
06-Dec-2025