Project Completion Certificate (Ground Water)
Scheme ID: 20026122 Name of Scheme: FATTEPUR KAKARDILA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 3310 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 12-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell assembly 27/73.3 fattehpur kakardila 26.399128 82.587297
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pumping 12.5 HP 700 fattehpur kakardila 26.40 82.59
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200/14 fattehpur kakardila 26.399 82.587
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.077
2 HDPE Pipe PN-6: Class PE-100 75 2.824
3 HDPE Pipe PN-6: Class PE-100 90 1.508
4 HDPE Pipe PN-6: Class PE-100 110 0.644
5 HDPE Pipe PN-6: Class PE-100 140 0.094
6 HDPE Pipe PN-6: Class PE-100 160 0.288
HSC Connection
Sno. Total Nos.
1 434
Other Details
2.43
2.42
2.42
11-Jan-2025
12-Jan-2025