Project Completion Certificate (Ground Water)
Scheme ID: 20026145 Name of Scheme: JAITI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 10-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 18.06M/77.88M JAITI 26.42807 83.04199
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 500LPM/45M JAITI 26.42807 83.04199
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125KL/14M JAITI 26.42807 83.04199
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.616
2 HDPE Pipe PN-6: Class PE-100 75 2.151
3 HDPE Pipe PN-6: Class PE-100 63 7.155
4 HDPE Pipe PN-6: Class PE-100 110 0.386
5 HDPE Pipe PN-6: Class PE-100 125 0.171
6 HDPE Pipe PN-6: Class PE-100 140 0.488
7 HDPE Pipe PN-6: Class PE-100 160 0.270
8 HDPE Pipe PN-6: Class PE-100 180 0.437
HSC Connection
Sno. Total Nos.
1 286
Other Details
1.88
1.98
1.98
20-Mar-2025
21-Mar-2025