Project Completion Certificate (Ground Water)
Scheme ID: 20026179 Name of Scheme: Fatahpur Ahtmali Village Water Supply No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 2514 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Aug-2022 Actual Date of Completion (Capex): 18-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 4
2 HDPE PIPE PN -6: CLASS PE -100 75 0.15
3 HDPE PIPE PN -6: CLASS PE -100 90 0.03
4 HDPE PIPE PN -6: CLASS PE -100 110 0.30
5 HDPE PIPE PN -6: CLASS PE -100 140 0.05
6 HDPE PIPE PN -6: CLASS PE -100 160 0.08
7 HDPE PIPE PN -6: CLASS PE -100 180 0.39
HSC Connection
Sno. Total Nos.
Other Details
2.16
2.16
1.87
19-Dec-2024
20-Dec-2024